« Back to all commercial projects
Medomak Valley Middle School
Catalano's Construction has been hired as a subcontractor to complete the installation of all the siding and trim for this 50,000 square foot building. The siding and trim detail consists of Azek composite material and cedar impression siding. This provides the building a low-maintenance exterior.
| Location: | Waldoboro, Maine |
| Year: | 2007 Complete |
| Design: | H. L. Turner Group |
| % Work Performed Own Forces: | 100% |



